Civil Engineer - Data Center Construction in Tashkent

19 Января

Партнерские Вакансии

Город:

Ташкент

Занятость:

Полная занятость

Опыт:

Более 6 лет

Компания "TECHENERGO Engineering Services"

Key Responsibilities:

  1. Project Planning and Design Review:

    • Review and interpret civil engineering drawings, specifications, and design documents.

    • Collaborate with architects, structural engineers, and other stakeholders to ensure that civil infrastructure designs meet project requirements.

    • Provide input during the design phase to optimize construction methods and materials.

  2. Site Preparation and Earthworks:

    • Oversee site preparation activities, including land clearing, grading, and excavation.

    • Ensure proper drainage systems are designed and implemented to prevent water accumulation and flooding.

    • Manage soil testing and geotechnical investigations to ensure the site is suitable for construction.

  3. Infrastructure Construction:

    • Supervise the construction of civil infrastructure, including foundations, slabs, roads, parking areas, and utility trenches.

    • Ensure that all civil works are executed in accordance with project specifications, codes, and standards.

    • Monitor the quality of materials and workmanship to ensure compliance with project requirements.

  4. Utility Systems:

    • Oversee the installation of underground utilities, including water supply, sewage, stormwater drainage, and electrical conduits.

    • Coordinate with utility providers to ensure timely and accurate installation of services.

    • Ensure that utility systems are integrated seamlessly with the overall data center infrastructure.

  5. Health, Safety, and Environmental Compliance:

    • Implement and enforce safety protocols to ensure a safe working environment for all personnel.

    • Ensure compliance with local, state, and federal regulations, including environmental and building codes.

    • Conduct regular safety inspections and risk assessments.

  6. Project Management and Coordination:

    • Coordinate with other engineering disciplines, contractors, and vendors to ensure smooth project execution.

    • Monitor project progress, identify potential delays, and implement corrective actions as needed.

    • Prepare and submit regular progress reports to the Project Manager.

  7. Quality Assurance and Control:

    • Conduct regular inspections and quality checks to ensure that all civil works meet the required standards.

    • Address any non-conformities and ensure that corrective actions are implemented promptly.

    • Maintain detailed records of inspections, tests, and approvals.

  8. Documentation and Reporting:

    • Maintain accurate and up-to-date project documentation, including drawings, specifications, and as-built records.

    • Prepare and submit daily, weekly, and monthly progress reports.

    • Document any changes or deviations from the original plan and ensure proper approval processes are followed.

Qualifications:

  • Education: Bachelor’s degree in Civil Engineering or a related field. A Master’s degree is a plus.

  • Experience: Minimum of 5-7 years of experience in civil engineering, with a focus on large-scale construction projects, preferably data centers or similar facilities.

  • Licenses/Certifications: Relevant certifications in construction management or safety (e.g., OSHA, NEBOSH, PMP, ISO 9001, ISO 14001) are a plus.

  • Technical Skills: Proficiency in civil engineering software (e.g., AutoCAD, Civil 3D, STAAD.Pro) and project management tools (e.g., Primavera, MS Project).

  • Soft Skills: Strong leadership, communication, and problem-solving skills. Ability to work effectively in a team and manage multiple stakeholders.

Key Competencies:

  • Attention to Detail: Ability to meticulously review plans, specifications, and construction activities to ensure accuracy and quality.

  • Problem-Solving: Strong analytical skills to identify and resolve issues that may arise during construction.

  • Time Management: Ability to manage multiple tasks and deadlines in a fast-paced environment.

  • Technical Expertise: In-depth knowledge of civil engineering principles, construction methods, and materials.

  • Safety Consciousness: Commitment to maintaining a safe work environment and ensuring compliance with all safety regulations.

Working Conditions:

  • Site-Based Role: This position requires working on construction sites in TASHKENT.

  • Travel: Occasional travel may be required to meet with stakeholders, attend meetings, or visit other project sites.

  • Hours: Flexibility to work outside standard business hours as needed to meet project deadlines.

Похожие вакансии

09 Января

QC Electrical Engineer( SHANDONG TIEJUN ELECTRIC POWER ENGINEERING CO., LTD )

Термез

Компания "SHANDONG TIEJUN ELECTRIC POWER ENGINEERING CO., LTD" SHANDONG TIEJUN ELECTRIC POWER ENGINEERING CO.,LTD. (The construction of CCPP...

Отправить резюме подробнее

09 Января

Инженер по охране труда и технике безопасности( MIR INSTRUMENTA TASHKENT )

Ташкент

Компания "MIR INSTRUMENTA TASHKENT" Обязанности: Осуществляет контроль над соблюдением на предприятии и в его подразделениях законодательных...

Отправить резюме подробнее

08 Января

Инженер по эксплуатации зданий и сооружений( GÖRGÜLÜ PLUS CONSTRUCTİON )

Ташкент

Компания "GÖRGÜLÜ PLUS CONSTRUCTİON" Обязанности: Ищем инженера-строителя для работы в сфере строительства. Должен быть в состоянии...

Отправить резюме подробнее

09 Января

Электрик( Wyndham Tashkent )

Ташкент

Компания "Wyndham Tashkent" Требования: - Допуск до тысячи Вольт, - Возможность работать в ненормированном графике с плавающими выходными,...

Отправить резюме подробнее

30 Декабря

Production engineer

Ташкент

Компания "OOO Coca-Cola Bottlers Uzbekistan, Ltd" About This Opportunity This role is responsible for effectively managing the...

Отправить резюме подробнее

Вакансия размещена в отрасли

Строительство / Недвижимость: