Civil Engineer - Data Center Construction in Tashkent
19 Января 2025
Город:
Ташкент
Занятость:
Полная занятость
Опыт:
Более 6 лет
Компания "TECHENERGO Engineering Services"
Key Responsibilities:
-
Project Planning and Design Review:
-
Review and interpret civil engineering drawings, specifications, and design documents.
-
Collaborate with architects, structural engineers, and other stakeholders to ensure that civil infrastructure designs meet project requirements.
-
Provide input during the design phase to optimize construction methods and materials.
-
-
Site Preparation and Earthworks:
-
Oversee site preparation activities, including land clearing, grading, and excavation.
-
Ensure proper drainage systems are designed and implemented to prevent water accumulation and flooding.
-
Manage soil testing and geotechnical investigations to ensure the site is suitable for construction.
-
-
Infrastructure Construction:
-
Supervise the construction of civil infrastructure, including foundations, slabs, roads, parking areas, and utility trenches.
-
Ensure that all civil works are executed in accordance with project specifications, codes, and standards.
-
Monitor the quality of materials and workmanship to ensure compliance with project requirements.
-
-
Utility Systems:
-
Oversee the installation of underground utilities, including water supply, sewage, stormwater drainage, and electrical conduits.
-
Coordinate with utility providers to ensure timely and accurate installation of services.
-
Ensure that utility systems are integrated seamlessly with the overall data center infrastructure.
-
-
Health, Safety, and Environmental Compliance:
-
Implement and enforce safety protocols to ensure a safe working environment for all personnel.
-
Ensure compliance with local, state, and federal regulations, including environmental and building codes.
-
Conduct regular safety inspections and risk assessments.
-
-
Project Management and Coordination:
-
Coordinate with other engineering disciplines, contractors, and vendors to ensure smooth project execution.
-
Monitor project progress, identify potential delays, and implement corrective actions as needed.
-
Prepare and submit regular progress reports to the Project Manager.
-
-
Quality Assurance and Control:
-
Conduct regular inspections and quality checks to ensure that all civil works meet the required standards.
-
Address any non-conformities and ensure that corrective actions are implemented promptly.
-
Maintain detailed records of inspections, tests, and approvals.
-
-
Documentation and Reporting:
-
Maintain accurate and up-to-date project documentation, including drawings, specifications, and as-built records.
-
Prepare and submit daily, weekly, and monthly progress reports.
-
Document any changes or deviations from the original plan and ensure proper approval processes are followed.
-
Qualifications:
-
Education: Bachelor’s degree in Civil Engineering or a related field. A Master’s degree is a plus.
-
Experience: Minimum of 5-7 years of experience in civil engineering, with a focus on large-scale construction projects, preferably data centers or similar facilities.
-
Licenses/Certifications: Relevant certifications in construction management or safety (e.g., OSHA, NEBOSH, PMP, ISO 9001, ISO 14001) are a plus.
-
Technical Skills: Proficiency in civil engineering software (e.g., AutoCAD, Civil 3D, STAAD.Pro) and project management tools (e.g., Primavera, MS Project).
-
Soft Skills: Strong leadership, communication, and problem-solving skills. Ability to work effectively in a team and manage multiple stakeholders.
Key Competencies:
-
Attention to Detail: Ability to meticulously review plans, specifications, and construction activities to ensure accuracy and quality.
-
Problem-Solving: Strong analytical skills to identify and resolve issues that may arise during construction.
-
Time Management: Ability to manage multiple tasks and deadlines in a fast-paced environment.
-
Technical Expertise: In-depth knowledge of civil engineering principles, construction methods, and materials.
-
Safety Consciousness: Commitment to maintaining a safe work environment and ensuring compliance with all safety regulations.
Working Conditions:
-
Site-Based Role: This position requires working on construction sites in TASHKENT.
-
Travel: Occasional travel may be required to meet with stakeholders, attend meetings, or visit other project sites.
-
Hours: Flexibility to work outside standard business hours as needed to meet project deadlines.
Зарегистрируйтесь или войдите, чтобы открыть контакты работодателя
Прикрепите резюме для отклика
Уже с нами?
Войдите, чтобы отправить резюме
09 Января
QC Electrical Engineer( SHANDONG TIEJUN ELECTRIC POWER ENGINEERING CO., LTD )
Термез
Компания "SHANDONG TIEJUN ELECTRIC POWER ENGINEERING CO., LTD" SHANDONG TIEJUN ELECTRIC POWER ENGINEERING CO.,LTD. (The construction of CCPP...
09 Января
Инженер по охране труда и технике безопасности( MIR INSTRUMENTA TASHKENT )
Ташкент
Компания "MIR INSTRUMENTA TASHKENT" Обязанности: Осуществляет контроль над соблюдением на предприятии и в его подразделениях законодательных...
30 Декабря
Ташкент
Компания "OOO Coca-Cola Bottlers Uzbekistan, Ltd" About This Opportunity This role is responsible for effectively managing the...
02 Января
Ташкент
Компания "OOO Coca-Cola Bottlers Uzbekistan, Ltd" Responsibilities To be guided by approved: international, state and local legislative...
02 Января
Термез
Компания "SHANDONG TIEJUN ELECTRIC POWER ENGINEERING CO., LTD" SHANDONG TIEJUN ELECTRIC POWER ENGINEERING CO.,LTD. (The construction of CCPP...
Вакансия размещена в отрасли